Roof perimeter and projection flashings must be installed correctly to ensure a long-lasting roof system. The following are considered basic flashing details. These have been pulled directly from the NRCA Roofing Manual. Installations vary by project.

Embedded Edge Metal Construction Detail

Embedded Edge Metal Construction Detail Installed

Metal Parapet Cap Construction Detail

Metal Parapet Cap Construction Detail Installed

Raised Perimeter Edge With Metal Fascia Construction Detail

Raised Perimeter Edge With Metal Fascia Construction Detail Installed
Surface Mounted Counterflashing Construction Detail

Surface Mounted Counterflashing Construction Detail Installed

Reglet Mounted Counterflashing Construction Detail

Reglet Mounted Counterflashing Construction Detail Installed

Expansion Joint Construction Detail

Expansion Joint Construction Detail Installed

Raised Curb Construction Detail

Raised Curb Construction Detail Installed

Plumbing Vent Construction Detail
Plumbing Vent Construction Detail Installed

Roof Drain Construction Detail

Roof Drain Construction Detail Installed
Penetration Pocket Construction Detail

Penetration Pocket Construction Detail Installed